Our Projects
infrastructure beirut
1995-1998 infrastructure works in down town Beirut (solidere) as subcontractor for ‘mouawad edde s.a.l company’. The executed works include 10km of highways, internal and secondary roads with all services: sewage, potable water of various pipes sizes, rain water drain, box culvert of reinforced concrete for rain water up to the sea, electrical rooms and precast installation for medium and high voltage tension lines, telephone lines, T.V. network lines, street lighting columns and lines, main and side irrigation networks in sidewalk with automatic equipment and water sewage.
infrastructure
1998-1999 installation works for telephone network in ghosta-batha-daroun-harissa from al zakhem company. (8km)
road construction
1999-2000 execution of nahr Ibrahim – yahchouch road (length 9km) with water irrigation channel and all retaining walls.
infrastructure
2001 execution of infrastructure works from baresel tajj company for potable water networks in “batha – daroun – ghosta – harissa†regions (about 6km).
tourism
2002 execution of a touristic project jbeil coast (la voile bleu) in 65 days. For a value of 1,3 million dollars.
infrastructure
2003 execution of the infrastructure project works for yahchouch municipality, financed by the international bank for a value of 200.000usd (contract no. 37/MLKE) during a three-month period -potable water installation (about 6km, pipes volume 350-450 mm) in safra from tajj company (Japanese loan).
chabrouh dam
2004-2005-2006 execution of the front side of chabrouh dam in kesrouan built by large rocks for length of 500m and height of 50m. Subcontractor from mouawad edde s.a.l. company.
road restoration
- construction and rebuilding of a landslide that occurred over yahchouch road. Gabion walls and armed-land walls in favor of engineer dr jean osta. (federation of kesrouan-ftouh municipalities)